Foundation & Basement Excavation in Abbotsford
Excavation for new homes, additions, garages, coach houses and shops in Abbotsford. We dig to the depths on your plans, haul or stockpile the material, and come back to backfill and rough grade once the foundation is in.
What's Included
- Stripping topsoil and stockpiling it for later landscaping
- Excavating to the footing elevations on your plans
- Trucking excess material off site
- Over-excavation and structural fill where soft soil is found
- Gravel under slabs and around footings
- Backfill after the foundation, damp-proofing and perimeter drain are in
- Rough grading so water drains away from the building
Groundwater and Soft Soils
In lower parts of Abbotsford, including much of the Sumas Prairie, groundwater can be close to the surface for much of the year. A basement dig there may need pumps running to keep the hole dry, and a geotechnical engineer may specify how deep to go and what to replace soft soil with. If you have a geotechnical report for your lot, send it with your quote request; it makes for a far more accurate price.
Additions and Tight Lots
Digging next to an existing house means protecting its foundation and keeping clear of existing services. On tight city lots, smaller machines and more trucking trips are often the answer. For small additions and garages, see our mini excavator services.
Working With Your Builder
We schedule around your builder and the City's inspections, so the excavation is ready when the forming crew arrives and backfill happens right after the foundation is approved.
Get a Free Excavating Quote
Tell us what needs to be dug, moved or levelled, where it is and how the equipment gets in. For new builds, say whether you have plans and a permit. You'll get a reply within one business day.
Frequently Asked Questions
How long does a basement excavation take?
A typical house basement dig takes a few days, depending on size, soil, groundwater and how much trucking is needed.
Do I need a permit before digging?
Yes, for a new house, addition or accessory building, the building permit should be in place before excavation starts.
What happens if you hit soft soil or water?
We stop and talk to you and, if there is one, your engineer. Soft spots usually get dug out and replaced with compacted structural fill; water is pumped out.
Do you do the backfill too?
Yes. Backfill and rough grading after the foundation and drain tile are in can be part of the same quote.